Arapahoe Sports Remodel Update

We are making some good headway on the Arapahoe Sports remodel. The excavation work is substantially done. The footers are poured. The foundation walls are poured. The electrical conduits are installed. The slab is poured. I think we will be seeing framed walls going up soon.

We have made similar progress on the deck, walkway, ramp and plaza remodel. A fair bit more excavation work to go. The footers are poured and the concrete forms are being prepared for the foundation wall pours.