Wednesday, July 20, 2016

Re-built Entrance To Early Riser

Some of you have been very justified to give me a hard time about how rough the upper entrance to Early Riser has been. The pot holes and lumps on it were horrible. Well, we spent the last couple of weeks re-building that driveway. That involved a significant excavation followed by the installation of geo-tech fabric, softball sized rock and lots of road base. The materials were graded and compacted and the entry is now much, much, much better.