Tuesday, July 14, 2020

Bottom Terminal Pallavicini

The foundations for the bottom drive station of Pali have been back filled. Preliminary grading has been completed. The two tower tubes that support the motor room and the bullwheel are standing. The motor room should be shipped to The Basin and installed by Friday.