The new Molly Hogan quad chairlift construction is well under way. The lift is a fixed quad so instructors can ride the lift with more than one student. The motor room or drive terminal will be at the top of the lift and there will be two towers. The concrete foundations for Tower 2 and the top terminal have been poured.
And, I am back from the river.