Our village of tiny buildings will be moved on to the hill later this week. The Lift Operator houses for the top and bottom of Molly Hogan and the bottom of Pallavicini have been in the Early Riser Lot for several weeks. The buildings were manufactured in Grand Junction and shipped to A-Basin. Our team installed the shingles, siding, and wainscoting to match other contemporary buildings at the resort. The foundations for these buildings are ready. Using a very large crane, the buildings will be set in place later this week.
The Top of Pali lift op house is being custom built on site.