Monday, September 7, 2020

Pali House

The exterior of the Top Of Pali Lift Operator House is complete. Inside, the insulation needs to be finished (the old had none), the wiring needs to be completed and the propane line and heater needs to be connected. This very small building will be much more comfortable for the operator. Did I mention the view?