The Wheels Up Trail is almost complete. The bridges are in place. The trail is connected top to bottom. We have some "final surfacing" work to do as well as the installation of signs. Thursday, Louis took our Forest Service Snow Ranger out for a misty trail tour to show off the almost finished product. Stay tuned over the coming week for an announcement about the complete trail opening. This is going to be fun.
Next up, the IMBA and A-Basin Trail Crew will head to the top of Radical to build the approximately .7 mile connection from that location across Standard, No Name, Radical, Challenger and Scudder en route to BML. By the end of September we should have an awesome 5 mile loop that tops out at the top of Radical.