Monday, July 18, 2022

Beavers Loop Bike Trail

Construction of the Upper Beavers Loop bike trail has begun. By Fall, we hope to have a top to bottom single track, one way (mostly down), bike specific trail completed. Generally the route will head down Zuma Cornice from the Summit until it is close to treeline. From there the trail will take a right turn and roughly follow treeline as it crosses Loafer, Beaver Bowl, Marmot, Davis, Thick and Thin, East Woods and the top of the Steep Gullies and Alleys before reaching the top of the Spine. From that point, the trail crosses Third Bowl, Pali Main Street, Pali Lift Line and North Glade before connecting with the existing trail at the top of Radical. The team is off to a good start heading down Zuma Cornice.

This ride will be spectacular.