The Beavers Loop trail building is going exceptionally well. With a combination of machine and hand building, the trail is complete from the top of Radical to the Top of the Spine. One crew has built the trail down Zuma Cornice to the top of Elephant's Trunk. They have made the big turn and are heading back towards Beaver Bowl and ultimately to Davis. The second crew is working in both directions from Davis, towards the top of the Spine and towards Beaver Bowl. We feel like we are on schedule to complete this by the time snowfall comes (sooner than most of you think).
We have done sample riding and photography trips. The reports back from riders are all A+. I think the pictures speak for themselves.